Children’s Hospital of The King’s Daughters’ (CHKD) Medical Tower II is a 14-story pediatric psychiatric hospital and outpatient center under construction in Norfolk, Va. The region currently has a severe shortage of mental health treatment for children, and the project, designed by Array Architects, is planned to address this need and deliver a dignified and unique care experience.
The 366,700-square-foot facility, scheduled to open in January 2022, will feature 60 private inpatient beds, a partial hospitalization program, behavioral and specialty clinics, an indoor gym, music and art therapy, a multi-sensory room, family lounge areas, and an expansive rooftop recreation and horticultural area.
Project details:
Facility name: Children’s Hospital of The King’s Daughters Behavioral Health Tower
Location: Norfolk, VA
Expected completion date: January 2022
Owner: Children’s Hospital of The King’s Daughters
Total building area: 366,700 sq. ft. (excluding parking)
Total construction cost: N/A
Cost/sq. ft.: N/A
Architecture firm: Array Architects
Interior design: Array Architects
Local Architect: PF&A
General contractor: WM Jordan
Engineering: O’Donnell & Naccorato (structural), TLC Engineering (Electrical/Plumbing), PACE (Mechanical) and VHB (Civil)
Builder: WM Jordan
from HCD Magazine https://ift.tt/2ZhT19X
via IFTTT
No comments:
Post a Comment