Steinberg Diagnostic Medical Imaging (SDMI; Las Vegas) broke ground on a new 10,000-square-foot, single-story outpatient imaging center project in Las Vegas.
The facility will include MRI, CT, 3-D mammography, ultrasound, DEXA scan, and X-ray equipment.
The project team includes IN2IT Architecture (architect; Las Vegas), SR Construction (design-build general contractor; Las Vegas), Wright Engineers (structural engineer; Las Vegas), and Helix Electric (engineer; Las Vegas).
The project is scheduled to be completed by September 2021.
from HCD Magazine https://ift.tt/3s3digI
via IFTTT
No comments:
Post a Comment